this week, for a change we all met up as a group and concluded on what tasks had been done and what needed to be completed before finalising everything and moving towards putting together our final presentation for ruth.

group discussions

we got together and went through what we had previously completed and summarised what had been done and what still needed completed. Initially we wanted to jump straight into our presentatiom but decided there were a final initial design areas we had to cover before that. Abi decided that it would be best to finish our blueprints as well as

putting together final pieces

towards the end we all came together with the different areas we had completed and put it togethert on our design and miro board. so far we have successfuly completed both together and as a group: workshop mock up schedules, a welcome booklet, a future state blueprint and poster designs for our branded project.

I feel we are back on track now with everything completed and can look towards adding the finishing touches to each of our worked areas.

preparing prototyping testing

our final stage before finishing our project rota, we want to actually test our prototype designs made for our project with an audience of interest, in this case where it is ruth our mentor as it is the closest we have to a prison member. We want to have relevant activity, introduction books and more prepared for her to test and trial which will allow us to conduct relevant feedback based on we have completed before our final presentation next week.